The Cost of Disruption in Network Projects

Beware of hidden costs and the penalty costs of when projects have to be prematurely rebuilt because you did not think long term

From an upcoming white paper on network infrastructure projects:

Many organizations that are looking at implementing a new network infrastructure for cloud computing; a new building being built; or any other network capability, better look closer at their network designs.

Why? All the cabling needed to build the network should fit the lifespan of the building, not the lifespan of the technology that is hanging off of it. A lot of network architects, network designers and "certified" network engineers seem to be forgetting this fundamental design concept.

They also seem to be forgetting the total costs involved in building a network, maintaining it, modifying it, and upgrading it.

Look at the Total Cost, Not Just the Upfront Costs
Over two decades ago, I discussed the True Total Cost of Networks in several articles as well as a couple of presentations at national conferences.

The formula was TTC = UC + (OC + OIC) + HC

where UC = Upfront Costs

OC = Ongoing Costs (external)

OIC = Ongoing Internal Costs

HC = Hidden Costs

Unless you factor all of these variables together, it does not add up to the True Total Cost (TTC).

Many people must have missed the articles and presentations because few actually look at network projects using the True Total Cost approach.

By implementing their network and then having to go back and re-cable it later because it became prematurely obsolete, they have proven that there is another hidden cost involved in their shortsighted approach when cabling new buildings: The Cost of Disruption.

The Cost of Disruption
There are many who will initially argue this "expanded" cost structure of TTC and say that the customer won't pay for it. To that, I say, "You need to sell the customer on why it is important to take all these costs into consideration and install the network that is going to last longer."

The design costs too much? You don't want to initially pull fiber along with the copper cable and pay for all the labor once, instead of twice? Why not? There is a legitimate cost savings there (just the labor cost alone is significant).

Not good enough? Calculate the "cost of disruption" then. How much does it cost three to five years from now when the new building is all built out and occupied, and now you have to upgrade the wiring throughout the building because you do not have the capacity anymore for all the applications needed to be serviced?

Move out the desks, break open the walls, pull cable from point A to point B, repeat 500 or 1000 times, disrupt whoever is working there and tell them it will only be a few weeks before everything will be upgraded.

Calculate all the demolition and re-building. Calculate the additional drywall needed, the re-painting of the walls and other finish issues. Calculate that lost productivity throughout the workspace.

What if it is a law firm or a medical office? How many hours are lost? It's not just the cost of materials and labor for the job; it's also the cost of disrupting all those people who are supposed to be working in the workspace.

Are you really saving money upfront by not pulling through that extra cable at the time of the initial cabling installation? I know you aren't.

Add to the Cost of Disruption the extra penalty of "Extra Cost to Upgrade" because of the added labor cost. That could be enough for some accounting person to say no to the upgrade because it costs too much. The end result: a prematurely obsolete installation that has far less capacity than what it should have, making the building or venue less viable.

Look beyond the initial project stages. Look at what the longevity of the cabling infrastructure should be. Spending a little more money upfront can guarantee a longer life for the network infrastructure that you want to use. Don't forget the Cost of Disruption when you calculate the cost of the job.

•   •   •

Copyright 2013 - James Carlini

More Stories By James Carlini

James Carlini, MBA, a certified Infrastructure Consultant, keynote speaker and former award-winning Adjunct Professor at Northwestern University, has advised on mission-critical networks. Clients include the Chicago Mercantile Exchange, GLOBEX, and City of Chicago’s 911 Center. An expert witness in civil and federal courts on network infrastructure, he has worked with AT&T, Sprint and others.

Follow daily Carlini-isms at www.twitter.com/JAMESCARLINI

Comments (0)

Share your thoughts on this story.

Add your comment
You must be signed in to add a comment. Sign-in | Register

In accordance with our Comment Policy, we encourage comments that are on topic, relevant and to-the-point. We will remove comments that include profanity, personal attacks, racial slurs, threats of violence, or other inappropriate material that violates our Terms and Conditions, and will block users who make repeated violations. We ask all readers to expect diversity of opinion and to treat one another with dignity and respect.


IoT & Smart Cities Stories
DXWorldEXPO | CloudEXPO are the world's most influential, independent events where Cloud Computing was coined and where technology buyers and vendors meet to experience and discuss the big picture of Digital Transformation and all of the strategies, tactics, and tools they need to realize their goals. Sponsors of DXWorldEXPO | CloudEXPO benefit from unmatched branding, profile building and lead generation opportunities.
Disruption, Innovation, Artificial Intelligence and Machine Learning, Leadership and Management hear these words all day every day... lofty goals but how do we make it real? Add to that, that simply put, people don't like change. But what if we could implement and utilize these enterprise tools in a fast and "Non-Disruptive" way, enabling us to glean insights about our business, identify and reduce exposure, risk and liability, and secure business continuity?
DXWorldEXPO LLC announced today that Telecom Reseller has been named "Media Sponsor" of CloudEXPO | DXWorldEXPO 2018 New York, which will take place on November 11-13, 2018 in New York City, NY. Telecom Reseller reports on Unified Communications, UCaaS, BPaaS for enterprise and SMBs. They report extensively on both customer premises based solutions such as IP-PBX as well as cloud based and hosted platforms.
Digital Transformation: Preparing Cloud & IoT Security for the Age of Artificial Intelligence. As automation and artificial intelligence (AI) power solution development and delivery, many businesses need to build backend cloud capabilities. Well-poised organizations, marketing smart devices with AI and BlockChain capabilities prepare to refine compliance and regulatory capabilities in 2018. Volumes of health, financial, technical and privacy data, along with tightening compliance requirements by...
In this Women in Technology Power Panel at 15th Cloud Expo, moderated by Anne Plese, Senior Consultant, Cloud Product Marketing at Verizon Enterprise, Esmeralda Swartz, CMO at MetraTech; Evelyn de Souza, Data Privacy and Compliance Strategy Leader at Cisco Systems; Seema Jethani, Director of Product Management at Basho Technologies; Victoria Livschitz, CEO of Qubell Inc.; Anne Hungate, Senior Director of Software Quality at DIRECTV, discussed what path they took to find their spot within the tec...
To Really Work for Enterprises, MultiCloud Adoption Requires Far Better and Inclusive Cloud Monitoring and Cost Management … But How? Overwhelmingly, even as enterprises have adopted cloud computing and are expanding to multi-cloud computing, IT leaders remain concerned about how to monitor, manage and control costs across hybrid and multi-cloud deployments. It’s clear that traditional IT monitoring and management approaches, designed after all for on-premises data centers, are falling short in ...
DXWordEXPO New York 2018, colocated with CloudEXPO New York 2018 will be held November 11-13, 2018, in New York City and will bring together Cloud Computing, FinTech and Blockchain, Digital Transformation, Big Data, Internet of Things, DevOps, AI, Machine Learning and WebRTC to one location.
Discussions of cloud computing have evolved in recent years from a focus on specific types of cloud, to a world of hybrid cloud, and to a world dominated by the APIs that make today's multi-cloud environments and hybrid clouds possible. In this Power Panel at 17th Cloud Expo, moderated by Conference Chair Roger Strukhoff, panelists addressed the importance of customers being able to use the specific technologies they need, through environments and ecosystems that expose their APIs to make true ...
"Space Monkey by Vivent Smart Home is a product that is a distributed cloud-based edge storage network. Vivent Smart Home, our parent company, is a smart home provider that places a lot of hard drives across homes in North America," explained JT Olds, Director of Engineering, and Brandon Crowfeather, Product Manager, at Vivint Smart Home, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
We are seeing a major migration of enterprises applications to the cloud. As cloud and business use of real time applications accelerate, legacy networks are no longer able to architecturally support cloud adoption and deliver the performance and security required by highly distributed enterprises. These outdated solutions have become more costly and complicated to implement, install, manage, and maintain.SD-WAN offers unlimited capabilities for accessing the benefits of the cloud and Internet. ...